A selection, not a complete register. Each entry keeps two facts apart: the status of the ETCS project, and whether operation without lineside signals is confirmed by a linked source. Level 2 with lineside signals does not count.

Last checked: 15 November 2026 · totals count confirmed entries only

3
In operation
0
Ongoing project
8
Planned
ETCS project: In operation3 confirmed without signals

UKNorthern City Line (Finsbury Park – Moorgate, London)

In operation

Without lineside signals since May 2025

Passenger services were already running with ETCS while the traditional signals remained in place. The remaining lineside signals were switched off and removed on 17–18 May 2025. Network Rail calls it the UK’s first signals-free commuter railway.

Without lineside signals
Confirmed“These signals were removed at the weekend (17/18 May).”

UKCambrian line

In operation

No-signals pilot since 2011

Early pilot of a railway without lineside signals on a rural line.

Without lineside signals
Confirmed“A no-signals railway was introduced as an early pilot on the rural Cambrian line in 2011.”

DELeipzig – Bamberg high-speed line, VDE 8.1 / 8.2 (Unterleiterbach – Erfurt, Erfurt-Linderbach – Halle-Planena)

In operation

Baseline upgrade planned for December 2030

Listed as Level 2 without signals with the note that the existing ETCS level does not change. Planned: upgrade from ETCS system version 1.1 to 2.1. The sections in the Erfurt node and Zapfendorf – Unterleiterbach are Level 2 with signals.

Without lineside signals
ConfirmedListed as “L2oS” with the footnote “Keine Veränderung zum im Bestand vorhandenen ETCS-Level”. Legend: “L2oS: ETCS Level 2 ohne Signale (ETCS only)”.

DKSvendborgbanen (Odense – Svendborg)

In operation

New signalling system in use since 19 October 2026

Full closure from 3 to 19 October 2026 for the roll-out. Banedanmark reports that the new digital signalling system is now in use between Svendborg and Odense.

Without lineside signals
Not yet verifiedThe Banedanmark releases read so far do not state the ERTMS level or the removal of lineside signals.

CHGotthard Base Tunnel

In operation

In operation since 2016

ETCS Level 2 throughout since the opening.

Without lineside signals
Not yet verifiedSource for operation without lineside signals still to be linked.
Source
No source linked yet

PTLisbon ring and northern lines

In operation

Completed in June 2026

20 km of ETCS Level 2 completed.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet
ETCS project: Ongoing project0 confirmed without signals

NOVestfoldbanen (Nykirke – Barkåker double track)

Ongoing project

Regular passenger traffic with ERTMS from 22 November 2026

On 11 November 2026 Bane NOR received permission from the Norwegian Railway Authority (SJT) to put the new ERTMS signalling system into use. Bane NOR describes a double-track high-speed line with ERTMS Level 2. Trains run without passengers from 14 November.

Without lineside signals
Not yet verifiedThe release names ERTMS Level 2. It does not mention lineside signals.

UKEast Coast Digital Programme (Welwyn Garden City – Hitchin and beyond)

Ongoing project

First multi-train ETCS test on the main line on 22–23 November 2025 with two Class 717 units and one Class 180. Network Rail expected passenger services to start using digital signalling between Welwyn and Hitchin in 2026. This is an overlay section: signals remain for now.

Without lineside signals
Not yet verifiedOverlay with lineside signals. Date for signal removal still to be sourced.

DKJutland / West Denmark (Fjernbane Vest)

Ongoing project

Roll-out of the Signalling Programme in western Denmark.

Without lineside signals
Not yet verifiedSection-specific source still to be linked.
Source
No source linked yet

DKEast Denmark (Fjernbane Øst)

Ongoing project

Roll-out of the Signalling Programme in eastern Denmark.

Without lineside signals
Not yet verifiedSection-specific source still to be linked.
Source
No source linked yet

NLERTMS programme, tranche 1 (northern lines, Zeeland, Kijfhoek – Belgium)

Ongoing project

National ERTMS programme, first tranche.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet

CZLipník nad Bečvou – Drahotuše

Ongoing project

Corridor section under reconstruction.

Without lineside signals
Not yet verifiedNot confirmed. Czech “exclusive ETCS operation” means trains must run under ETCS; whether lineside signals are removed on this section is still to be sourced.
Source
No source linked yet

PLWarsaw – Łódź

Ongoing project

ETCS Level 2 is being installed.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet

FRLGV Sud-Est (Paris – Lyon)

Ongoing project

Conversion of the existing high-speed line to ETCS Level 2.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet

DEFreiburg – Haltingen / Müllheim – Schliengen

Ongoing project

ETCS Level 2 Baseline 3.

Without lineside signals
Not yet verifiedNot part of DB InfraGO’s overview of L2oS measures until 2031 (18 August 2026).
Source
No source linked yet
ETCS project: Planned8 confirmed without signals

DELüneburg – Dannenberg

Planned

ETCS commissioning planned for June 2029

All tracks of all operating points from Wendisch Evern to Dannenberg Ost. ETCS system version 2.1.

Without lineside signals
ConfirmedListed as “L2oS”, all tracks, commissioning 2029/06.

DES-Bahn Hamburg: Hammerbrook – Neugraben (S6 south)

Planned

ETCS and ATO GoA2 commissioning planned for December 2029

All tracks from Hamburg Elbbrücken to Hamburg-Neugraben. ETCS system version 2.1.

Without lineside signals
ConfirmedListed as “L2oS”, all tracks, commissioning 2029/12.

DES-Bahn Hamburg: Wedel – Blankenese – Klein Flottbek

Planned

ETCS and ATO GoA2 commissioning planned for December 2030

ETCS system version 2.1.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2030/12.

DECzech border – Pirna (Bad Schandau border – Pirna)

Planned

ETCS commissioning planned for December 2031

First and second construction stage Dresden – Czech border. All tracks Level 2 without signals except Bad Schandau, where the line to and from Sebnitz stays PZB only.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2031/12; Bad Schandau: L2oS, L2mS and PZB.

DELeipzig-Engelsdorf – Riesa

Planned

ETCS commissioning planned for December 2031

Mixed equipment at the Leipzig end: Leipzig-Engelsdorf is a transition area with Level 2 with signals, Leipzig-Engelsdorf Ost is partly equipped. From Borsdorf all tracks are Level 2 without signals.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2031/12; Leipzig-Engelsdorf “ein Teil der Gleise, ETCS L2mS”.

DEMünchen – Rosenheim (Grafing – Rosenheim)

Planned

ETCS commissioning planned for December 2031

Level 2 without signals starts beyond Grafing station; the whole of Grafing station keeps PZB. ETCS system version 2.0.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2031/12; “ETCS L2oS Ausrüstung der Strecke 5510 erst hinter Bahnhof Grafing”.

DEStendal – Magdeburg (Demker – Wolmirstedt)

Planned

ETCS commissioning planned for December 2031

Mixed equipment at both ends (Demker, Wolmirstedt); all tracks in between Level 2 without signals. ETCS system version 2.1.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2031/12; Demker and Wolmirstedt “ein Teil der Gleise, L2oS / L2mS”.

DEUelzen – Stendal (Wieren – Kläden)

Planned

ETCS commissioning planned for December 2031

Mixed equipment in Wieren, Salzwedel and Kläden; all tracks of the other operating points Level 2 without signals. ETCS system version 2.1.

Without lineside signals
ConfirmedListed as “L2oS”, commissioning 2031/12; Wieren, Salzwedel, Kläden “ein Teil der Gleise”.

FR“Grand soir”: first conventional line without signals

Planned

Announced first switch-off of signals on an existing line.

Without lineside signals
Not yet verifiedReported as without signals; primary source still to be linked.
Source
No source linked yet

DEDigital Node Stuttgart (Digitaler Knoten Stuttgart)

Planned

ETCS and digital interlocking in the Stuttgart node.

Without lineside signals
Not yet verifiedNot part of DB InfraGO’s overview of L2oS measures until 2031 (18 August 2026).
Source
No source linked yet

DEKohlscheid – Rheydt

Planned

ETCS project.

Without lineside signals
Not yet verifiedNot part of DB InfraGO’s overview of L2oS measures until 2031 (18 August 2026).
Source
No source linked yet

PLKatowice – Kraków

Planned

ETCS Level 2 planned.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet

PLSzczecin – German border (lines 408 / 409)

Planned

Cross-border ETCS implementation Szczecin – Berlin.

Without lineside signals
Not yet verifiedSource still to be linked.
Source
No source linked yet
Not listed
  • E30 Legnica – Węgliniec (PL): ETCS Level 2 is in operation, but signals remain for trains that are not equipped. Mixed operation, not Level 2 without signals.